News from HEB

20171012-JCK_3073-1920x600

News from HEB

Loon Mountain Bridge Replacement Funding Approved

January 23, 2013

The Town of Lincoln recently received notification from FEMA representatives that the proposed replacement of the Loon Mountain Bridge is the most cost-effective use of…

View full post...

HEB Begins Preliminary Design of Stark Covered Bridge

December 14, 2012

HEB’s has received authorization from NHDOT and the Town of Stark to move ahead with preliminary design activities for the rehabilitation of the Stark Covered…

View full post...

HEB Provides Structural Engineering for Mt. Washington Hotel

November 16, 2012

HEB’s engineers have been working with Omni Mount Washington Resort to prepare structural assessments and design repairs as part of the ongoing roof project at…

View full post...

Littleton South Street Sidewalk Construction Underway

November 5, 2012

The South Street sidewalk in Littleton, NH, was seriously under-supported and deteriorated.  The Town of Littleton engaged HEB to design a sidewalk reconstruction that would…

View full post...

River Street Berm Repair Under Construction

October 11, 2012

The River Street Berm repair project has been awarded to Drew Corporation of Lovell, Maine.  Construction easements are in place and work has begun on…

View full post...

Camp Dodge Road Bridge Engineering Study

September 6, 2012

HEB Engineers has completed an engineering study, geotechnical report, and hydrologic/hydraulic (H&H) analysis for the Camp Dodge Road Bridge over Cowboy Brook in the White…

View full post...

River Street Berm Repair in Bidding Phase

August 23, 2012

HEB Engineers is working with the Town of Bartlett to coordinate contractor bidding for the River Street Berm repair.  The project, designed to repair damage…

View full post...

Tuckerman Ravine Watershed Analysis & Trail Bridge Design

August 6, 2012

HEB Engineers has submitted hydrologic and hydraulic (H&H) studies for six bridges in the Culter River watershed, as well as preliminary design for Tuckerman Ravine…

View full post...

Loon Mtn Bridge Engineering Study Approved

July 16, 2012

HEB’s engineering study for the Loon Mountain Bridge has been approved by the Town of Lincoln and the New Hampshire Department of Transportation.  HEB is…

View full post...

Hastings Trail Bridge Design

July 12, 2012

HEB’s engineers have submitted initial geotechnical and hydrology reports to the US Forest Service for the design of the Hastings Trail Bridge replacement in Batchelders…

View full post...

Berlin Regional Airport Jet-A Fuel Tank Project

June 25, 2012

HEB is currently coordinating public bidding for the new Jet-A Fuel Tank Installation project at the Berlin Regional Airport (BML) as part of a 3-year…

View full post...

HEB Selected for WMNF Term Contract

June 20, 2012

HEB Engineers was recently selected by the US Forest Service for a multi-year term contract for projects in the White Mountain National Forest.  The projects…

View full post...

Archives