Stark Bridge Schematic Design

HEB’s Structural Group is currently working on the engineering study for the historic Stark Covered Bridge rehabilitation.  This phase of the project includes assessing existing conditions of the bridge and analyzing three different rehabilitation design strategies to be presented to the Town and NH Dept. of Transportation.  We expect to review a final draft of the study with Town selectmen soon.  The project is progressing on schedule and we have received excellent input from the community so far.  For additional information about the project, please contact us at (603) 356-6936 or email jross@hebengineers.com.