Conway Village Fire District

HEB was selected to complete the engineering necessary to replace and extend existing sewers in the vicinities of Tasker Hill Road and East Main Street in ConwayNH. Approximately 1/3 of the projects' sewer mains were designed by updating and revising plans that were prepared by another firm 14 years earlier. Utilization of these plans resulted in significant cost savings to the district.

The project included construction of 6800 LF of gravity sewer mains, 1200 LF of sewer force mains, 2 small grinder pump stations, 33 manholes, and 96 house connections. This was the first project to receive partial funding from the State of New Hampshire's 20% construction grant program (HB 1376).

HEB prepared a budget estimate, pre-design survey, preliminary and final design, and construction contract documents for replacement of approximately 2600 linear feet of waterline in this Conway Village location. The old 6-inch cast iron and transite mains were replaced with 8-inch ductile iron pipe. HEB also provided complete bidding and construction administration services.

Copyright 2009 HEB.  2605 White Mountain Highway, North Conway, NH 03860.  (603) 356-6936.